- The DIP switches located and

4.3 DIP Switch Settings

accessed from the rear-right portion of the chassis must be
properly set according to application requirements. Obtain the
Installation Record Sheet produced specifically for the appli·
cation. A blank Record Sheet is shown in the Table 4.A, page
19. Both DIP switches contain eight 2-position switches which
are set in combination. (See Figure 4.5.) The switches are
turned ON or OFF by sliding the switch. As you face the DIP
s witches, slide:
To the LEFT to turn the switch OFF
To the RIGHT to turn the switch ON
Figure 4.6 shows a side view of a single slide switch and how
it is turned on and off.
Observe the ON and OFF designations on the DIP switches
shown in Figure 4.5. Always look for the OFF and ON desig­
nations on the hardware or printed circuit board to be sure
you are setting the switches correctly.
After all the DIP switches are set according to the settings
listed on the Installation Record Sheet, the system is ready
to have AC power applied. Follow the procedure listed in Para­
graph 4.4 when first applying power to the 10 Data.
- The information here is intended to be

4.4 Initial Startup

used when first applying AC power to the 10 Data. Each item
is shown with a box to the left. In this way it can be used as
a checklist to reduce the chance of omitting or skipping an
item .
The following startup procedures must be performed only
by qualified personnel who are familiar with the 10 Data
and its associated electrical and/or mechanical equipment.
Failure to observe this caution can result in serious or even
fatal personal injury and/or equipment damage.

4.4.1 Before Power Application

power to the 10 Data, perform the following:
D
Verify that the incoming AC power to the system is discon­
nected.
D
Verify all DIP switches are set according to the lnstalla·
tion Record Sheet.
D
Verify that all wiring is correct, as shown on the wiring plan
drawings.
When possible, disable the 10 Data until the rest of the
D
machine or process has been started up and checked out.

4.4.2 Initial Power Application

steps when first applying AC power to the 10 Data:
If installing an 10 Data without a three-phase Power Module
(2D78533G01 ):
D
Apply 120 or 240 VAC to terminals 7 and 10 of the unit.
Zeros should appear in both screens and the VA - s and lA
LEDs should be lit.
- Before applying AC
Perform the following
-
OFF- ON
SW1
SW2
Figure 4.5 DIP Switches
D
Figure 4.6 - DIP Switch (side view)
D
Turn on AC power and verify the voltage and current values
shown.
T his is the last step if installing an IQ Data without a three­
phase Power Module.
Shaded area designates
replaces or supplements applications using
18
the 3-phase Power Module.
TD 172838
Current transformer's ratio
50/60 Hz selection
Potential transformer's ratio
3 wire/4 wire system
8
D
OFF
___
information that

Advertisement

Table of Contents
loading

Table of Contents