Attach the bracket to the copier
4. Screw on the PayCon with the 3 screws.
5. Loop the wire trough the ferrite core you will attach the the top, and use the existing cable guiders to guide the wire trough
6. Connect the copy cable and close the back and side flap. Guide the cables in the slit wrap harnas and attach it to the cable guide with
the rip ties. Connect the network cable to the socket hidden behind the corner flap
7. Remove the transport foils to finish the installation
Version 2.2.20
-
15