Verifying Ground Connections; Power Up - Dekolink Deko4078SD Product Manual

Digital multi channel selective 700/800 mhz signal booster
Table of Contents

Advertisement

P
M
RODUCT
ANUAL
3.4
V
ERIFYING
All of the units' grounding lugs are located on the left side of their rear panels. The
Deko4078SD units' ground connections are interconnected and the final grounding
connection is performed to the cabinet rack grounding lug located on the left side of
the bottom shelf (accessed from the rear). See below.
In addition, it is required to connect the rack ground to the building ground.
3.5
P
OWER
1. Connect the power connector on the Power Supply rear panel to a 220/110 VAC
power source.
2. Maintain the Main unit in idle state (after power up) for approximately one or
two minutes. This time lapse is required for the CPU boot up. After the boot-up
process is complete, the SYSTEM READY GREEN LED will light.
3. Verify that the PWR ON LED on the Main unit front panel is GREEN.
Page 20
D
4078SD M
-C
EKO
ULTI
HANNEL
G
ROUND
Figure 9. Final Grounding Connection
U
P
ATTENTION!
Be sure that grounding is performed properly and
that all required RF connections (Donor and Service
antennas in case of a supplied cabinet installation)
before powering-up the units
Proprietary Data
S
B
D
IGNAL
OOSTER
C
ONNECTIONS
W
L
.
EKOLINK
IRELESS
TD
Power On
indicator
P/N 300SC30031 Rev. 1.2

Advertisement

Table of Contents
loading

Table of Contents