Equipment Reception - Salicru SLC ADAPT User Manual

Hide thumbs Also See for SLC ADAPT:
Table of Contents

Advertisement

The data in the nameplate of the equipment shows the
nominal currents only as the safety standard EN-IEC
62040-1 states. The overload conditions are considered as
a nonpermanent and exceptional operating mode.
If peripheral elements are going to be added at the input, output
or bypass of the UPS or parallel systems like transformers or auto-
transformers, the stated currents in the nameplates of those parts
must be considered in order to use the appropriate cross cable
section, by respecting the Local and/or National Low Voltage Elec-
trotechnical Regulation.
Once the installation is finished, do not forget that the by-
pass panel is connected to a UPS or UPS set. Starting from
the concept that the UPS is an electrical generator, the end
user will take the needed cautions against the direct or in-
direct contact.

5.2. EQUIPMENT RECEPTION.

5.2.1. Unpacking, contents checking and inspection.
To unpack it, see section 5.2.3.
When receiving the equipment, check that no damages
have occurred during transport (impacts, falls, ...) and the
features of the equipment corresponds with the stated in
the purchase order, so it is recommended to unpack the
equipment for an initial visual inspection.
In case of observing damage, make the appropriate claims
to your supplier or in lack of it to our firm.
Do not start up any equipment when external dam-
ages have been observed.
Also check that the data in the nameplate sticked in the
packaging and the equipment, correspond to the one stated
in the purchase order, so it will be needed to unpack it (see
section 5.2.3). Otherwise, make the nonconformity as soon as
possible, quoting the serial number of the equipment and the
reference in the delivery note.
Check the contents in the packaging:
The own bypass panel.
ˆ
The user's manual in electronic format (CD-ROM).
ˆ
Those panels supplied in wall mounting format, the ac-
ˆ
cessories to fix it to the wall (bolts and nuts and sup-
ports) and the whole layout diagram.
Once the reception is finished, it is better to pack the panel again
till its commissioning, in order to protect it against mechanical
impacts, dust, dirt, etc...
5.2.2. Storage.
The equipment storage, will be done in a dry and cool place,
protected from rain, dust and water jets or chemical agents. It
is advisable to keep the equipment inside its original packaging
10
because it has been designed to guarantee the maximum pro-
tection during transport and storage.
5.2.3. Unpacking.
The equipment unpacking can have wooden pallet, card-
board or wooden box depending on the case, expanded pol-
ystyrene corners (EPS) or polyethylene foam (EPE), plastic
bag and polyethylene bands. All materials are recyclable;
so if they are going to be disposed, do it in accordance with
the regulations in force. It is recommended to keep the
packaging, in case it was needed in future.
Proceed to the equipment unpacking.
To do it, cut the bands of the cardboard enclosure and/or the
sealing adhesive tape. Those panels with wooden packaging,
open it with the appropriate means available.
Remove the equipment out from the cardboard or wooden en-
closure.
5.2.4. Relocation till the installation place.
If the reception area is far from the installation place, it is
recommended to move the equipment by means of a pallet
jack or the most suitable transport means, keeping in mind
the remoteness between both points.
If the distance is important, it is recommended to move the
equipment completely packed till the installation place and
later on unpack it.
5.2.5. Location.
Locate the equipment paying attention to the indications
and recommendations stated in the safety instructions
EK266*08.
The equipment will be located close to the UPS or parallel
system based on «n» equipments.
The manual bypass panels are supplied in wall mounting
cases, less those exception cases assembled in floor
standing cabinets.
For the first option, make the wholes in the wall according
to the diagram, supplied in paper together with the fixing
accessories, and proceed to fix it.
5.3. CONNECTION.
Wall mounting cases are supplied with the cable glands al-
ready assembled, of the suitable size for the foreseen cables.
Depending on the input, bypass and/or output typology
(single phase or three phase), the quantity of terminals of
each strip can differ. Connect the corresponding cables ac-
cording to each case, by respecting the phase (R) or phases
(R-S-T) and neutral (N) rotation.
SALICRU

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Slc cube 3+Slc twin proSlc twin pro 33Slc x-tra

Table of Contents