Installing The Web Pdi And Connecting The Cable; Fixing The Web Pdi At The Installation Site - LG PQCPM11A0 Installation And Owner's Manual

Web based power distribution indicator
Table of Contents

Advertisement

2. Installing Web PDI

Installing the Web PDI and Connecting the cable

After setting the PDI, the Web PDI should be installed at the suitable place and the RS485 cable
should be connected to communicate with the PDI. And, the Ethernet cable should be connected for
connecting to the Internet.

Fixing the Web PDI at the installation site

The Web PDI is basically designed to be installed at the wall to use. Install the Web PDI at the
suitable place as the following description. Here, the installation method of the Web PDI is described
with the example installing the Web PDI at the wall.
1.
Decide the space to install the Web PDI. Before installing the Web PDI, check whether the place is
suitable for connecting the Web PDI and the RS485 cable.
2.
Use the screw driver to fix them at the wall. It can be fixed as shown at the following figure
according to the installation place.
2-4
Web PDI
1
D I
2
3
4
5
6
L G -N
7
8
L G -N
9
1 0
1 1
L G -N
1 2
1 3
L G -N
1 4
1 5
1 6
1 7
1 8
1 9
2 0
M E N
U /
S E L E
C T
E th e
E th e
1
D O
2
3
4
E T 1
T X
R X
E T 2
T X
R X
E T 3
T X
R X
E T 4
T X
R X
F D D
T X
R X
E x t.
T X
R X
rn e t
1
A C T
L N K
rn e t
2
A C T
L N K
C o n s
o le
T X
R X
R u n
P o w e
r

Advertisement

Table of Contents
loading

Table of Contents