Inputs; Switched Resistor Example Wiring; Installation; Dimensions - Resource Data Management PR0712-EPR Installation & User Manual

Mercury 2 & intuitive epr stepper valve controller
Table of Contents

Advertisement

Mercury 2 & Intuitive Mercury EPR Stepper Installation Guide

Inputs

Input resistance:
Input type
Comms:

Switched Resistor Example Wiring

Example of resistor fitted on a probe input.
Connect to remote switch or relay

Installation

Panel Cut-out and Clearances
Mercury Mk2 (Flush mount controller)

Dimensions

Mercury Mk2
Dimensions
Warning
Ensure that all power is
switched off before
installing or maintaining
this product
Please Note
3.01K Ohms (for PTC or NTC type probes)
PT1000 or NTC2K or NTC2K25 or NTC10K (selectable)
RS232 with flow control
Probe Ground
Probe Signal
Revision 1.2a

Fixing

The controller is fixed by sliding the 2 plastic retaining
clips up to rear of the panel. These clips have a ratchet
action and can be removed by holding in the clip sides
and sliding back.
Page 23 of 25
www.resourcedm.com

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pr0752-eprPr0713-eprPr0762-epr

Table of Contents