Remove protective covering from panels, if applied.
Check that all cam locks are engaged.
Insert plug buttons into the cam lock wrench access holes and firmly tap in place
using a rubber mallet.
Plug buttons supplied for walls and ceilings are vinyl, plug buttons supplied for
floors are either stainless steel or high-strength plastic
Some areas of walk-in panels contain working parts and should not be
penetrated. Do not make a penetration within 2" of cam lock holes or panel
seams.
Penetrations must be completely sealed (insulation, foam, etc.) to prevent heat
transfer and condensation/ice formation. Electrical penetrations must be sealed
both internally and externally to form an acceptable seal.
Penetrations is outdoor ceilings is not permitted.
www.kolpak.com
Plug Button Installation
Penetrations
Trim and Wainscoting Material Installation
800-225-9916
20