TYAN FT48T-B7105 Service Engineer's Manual page 42

Table of Contents

Advertisement

5.
To secure the heatsink, use a T30 Security Torx to tighten the screws in a
sequential order (1234).
NOTE:
When disassembling the heatsink, loosen the screws in reverse order
(4321).
6.
Repeat the procedures described earlier to install the second processor and
heatsink.
7.
Place the CPU air duct back and screw it to the chassis.
42
http://www.tyan.com

Advertisement

Table of Contents
loading

Table of Contents