Power Modulation And Combustion System - Adisa ADI CD 70 Technical Manual Of Installation, Use And Maintenance

Adi cd series
Table of Contents

Advertisement

ADI CD boiler - Technical Manual

8. POWER MODULATION AND COMBUSTION SYSTEM

13
5
11
12
NOTE: this is a guide diagram; according to the model, the position of electrodes, pilot flame, motor fan and gas
shut-off valve can vary.
Gas filter in models ADI 850 and 950:
In these models, the gas filter is supplied dismantled inside the boiler, for an
easier and safer transport.
It must be assembled once the boiler is in the installation.
The minimum gas pressure gauge is connected to the gas filter inlet.
In order to rotate the motor-fan group and take off the burner, you have to
remove first the gas filter and then proceed according to the instructions indicated
in the corresponding chapter (19.1).
8
14
7
6
11
1
15
9
4
2
(1) Burner of fire resisting alloy mesh
(2) Ionization electrode (checking the flame
presence)
(3) Ignition electrode
(4) Pilot flame
(5) Venturi for the air-gas mix
(6) Gas shut-off valve
(7) Gas inlet (boiler gas connection to the
7
installation)
(8) Fan for the air-gas mix
(9) Variable speed motor-fan
(10) Air inlet
(11) Flange of the group motor-fan, to be coupled
to the flange of the boiler heat exchanger
(12) Ignition-ionization kit
(13) Pressure connection for the gas valve (just
models CD 200 and higher)
(15) Air filter (just models CD 200 and higher)
10
15
5
3
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Adi cd 375Adi cd 950Adi cd 750Adi cd 450Adi cd 850

Table of Contents