Framing Dimensions - EcoSmart EL40 Installation, Operation And Maintanance Manual

Electric series
Table of Contents

Advertisement

INSTALLATION
1. Prepare the framed opening using wood or metal studs according to
the Framing Dimensions chart
H

FRAMING DIMENSIONS

Model
w
EL40
55 3/4" (1416mm)
EL60
75 3/4" (1924mm)
EL80
95 3/4" (2432mm)
EL100
115 3/4" (2940mm)
EL120
135 3/4" (3448mm)
2. Install L Metal Nailing Flanges
To be performed by a qualified electrician according to
local building codes.
3. Connect hard wire to the terminal block according to the diagram
below. Choose any connector type according to local building code.
D
w
H
D
23" (584mm)
12" (305mm)
23" (584mm)
12" (305mm)
23" (584mm)
12" (305mm)
23" (584mm)
12" (305mm)
23" (584mm)
12" (305mm)
Terminol Block
4. Install the fire unit in the framed opening with a minimum 1 ¼ (32mm)
drywall screws to secure the unit.
5. Mask the exposed fire unit during the drywall process. Install drywall
to the drywall stops on the perimeter of the fire insert. For more
information on the drywall stops see the Product Guide on page 3.
Decorate as desired.
6. After installation, user may elect to use the L Metal Deco Trim. To
install, use a small amount of construction adhesive and secure to
the drywall face.
© Copyright 2004 - 2017 EcoSmart Inc. All rights reserved. V02JN17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

El60El80El100El120

Table of Contents