4.3
Installing AC Output Power Cables
NOTE
You need to prepare M8 OT terminals by yourself.
If you connect a ground cable to the ground point on the chassis shell, you are advised to use a
three-core outdoor copper-core cable with a cross-sectional area of 25 mm
power cable.
If you connect a ground cable to the ground point in the maintenance compartment, you are
advised to use a four-core outdoor copper-core cable with a cross-sectional area of 25 mm
the AC output power cable.
For more details about cable specifications, see the SUN2000-(55KTL, 60KTL) Series User
Manual .
1. Remove an appropriate length of the jacket and insulation layer from the AC output power
cable using a wire stripper. (Ensure that the jacket is in the maintenance compartment.)
a. Three-core cable (excluding the ground cable and neutral wire)
b. Four-core cable (including the ground cable but excluding the neutral wire)
2. Prepare OT terminals.
Insulation layer
Core wire
Core wire
Insulation layer
Heat
gun
8
2
Jacket
Heat shrink
tubing
Hydraulic pliers
as the AC output
2
as