Make sure that the sealing ring 6 is placed (at the place of connection of the ventilator plug) before
3)
installing the separator onto the boiler (see Scheme 9);
Install the channel separator 2 onto the boiler, controlling that the plug won't "bite on" the sealing ring 6
4)
(see Scheme 9);
5)
Fix the channel separator by four screws 3 (previously install first the plain washer4, and then the ring 5 on
each screw) (see Scheme 9);
Make sure that there are sealing rings 7 (2 pcs.) placed on the inlet and outlet of the channel separator before
6)
further installation of the smoke exhauster and air duct pipes (see Scheme 9);
7)
The installation of the air inlet pipe and the smoke exhauster pipe must be effectuated in accordance with
Scheme 6 (see p.9.2.1, page16).
1- Boiler;
2- Channel separator
3- Screw Ph - 4,8х60 DIN 7981;
Scheme 9. Channel separator installation scheme
4- plain washer 5,3х10 DIN 125;
5- ring 005-008-19-2-2 GOST 9833-73;
6- sealing ring
7- sealing ring