Scheme 6. Installation of separate pipes of smoke exhauster and air duct by means of transitional set
The transitional set consists of details 7, 8, 9 (see Scheme 6.). The smoke exhauster adapting pipe 7 is installed to the
central orifice on the upper surface of the boiler and is fixed by clip 8.
The boiler's construction provides a possibility of installation of the air duct pipe 3 (air inlet) both on the left and on
the right side from the smoke exhauster pipe.
Technical staff manual
9.2.2. Installation of separate pipes of smoke exhauster and air duct by means of channel separator 8023-10.000
CAUTION! In order to install the channel separator 8023-10.000 onto the boiler you must have the following items
(not included into the supply package):
-screw (self-driving screw) Ph - 4,8x60 DIN 7981 – 4 pcs.;
-plain washer 5,3х10 DIN 125 (GOST 11371) – 4 pcs.;
-ring 005−008−19−2−2 GOST 9833−73 or a sealing laying with inner diameter 5 mm and external diameter 8...10
mm (material-paronite) – 4 pcs.;
The channel separator installation sequence:
-Unscrew eight screws 1 and take off the duct slice 2 (see Scheme 7);
Scheme 7. Duct slice dismantling 2) install the laying 1 (supplied together with the boiler) (See Scheme 8);
Scheme 8. Plug and laying installation