Pass/Fail Criteria
As a Final Acceptance Test, the following tests should be run to meet the Pass/Fail
criteria:
1. Successful completion of the POST tests.
2. Successful completion of the following AMI module tests (one pass):
System Board
Memory
Video
Hard Disk
Floppy Disk
Keyboard
COM Ports
LPT Ports
Pointer Device
3. Successful bootstrap of the computer installed operating system.
Operating systems supported:
•
Windows for Workgroups
•
Windows 95
•
Windows NT Workstation
Remove any software that was put on the hard disk drive to enable repair of the
computer before shipping.
When completed, clean the outside of the computer with cleaning solution.
(All Tests)
(All Tests)
(All Tests)
(All Tests except: sequential write/read and sequential
write/random read)
(All Tests)
(All Tests)
(All Tests)
(All Tests)
(All Tests)
Troubleshooting
4-3