Download Print this page

Suzuki SWIFT RS415 2017 Service Manual page 354

Advertisement

1G-3 Fuel System:
3) Connect special tools and hose between fuel feed
hose (1) and fuel delivery pipe as shown in the
figure, and clamp hoses securely in order to ensure
that no leaks occur during checking.
Special tool
(A): 09912–58442
(B): 09912–58432
(C): 09912–58490
4) Check that battery voltage is 11 V or more.
5) Measure fuel pressure at each condition.
If measured pressure is out of specification, refer to
"Fuel Pressure Check: in Section 1A" and check
each possibly defective part. Replace if found
defective.
a) Turn ignition switch ON to operate fuel pump and
after 2 seconds turn it OFF. Repeat this 3 or 4
times and then check fuel pressure.
Fuel pressure specification
With fuel pump operating and engine
stopped: 270 – 310 kPa (2.7 – 3.1 kg/cm
– 44.0 psi)
b) Start engine and warm it up to normal operating
temperature, and measure fuel pressure at
idling.
Fuel pressure specification
At specified idle speed: 270 – 310 kPa (2.7 –
3.1 kg/cm
2
, 38.4 – 44.0 psi)
c) Stop engine, and measure fuel pressure at one
minute after stopping.
Fuel pressure specification
With 1 min. after engine (fuel pump) stop
(Pressure reduces as time passes): Over 250
kPa (2.5 kg/cm
2
, 35.6 psi)
6) After checking fuel pressure, remove fuel pressure
gauge.
(A)
(B)
1
(C)
I3RM0A170004-
2
, 38.4
WARNING:
As fuel feed line is still under high fuel
pressure, make sure to release fuel pressure
according to the following procedures.
• Place fuel container under joint.
• Cover joint with rag and loosen joint nut
slowly in order to release fuel pressure
gradually.
7) Remove special tools from fuel delivery pipe and fuel
feed hose.
8) Connect fuel feed hose to fuel delivery pipe and
clamp it securely.
9) With engine OFF and ignition switch ON, check for
fuel leaks.
Fuel Cut Operation Inspection
NOTE:
Before inspection, make sure that gear shift
lever is in neutral position (shift select lever
is "P" range for A/T vehicle), A/C is OFF and
parking brake lever is pulled all the way up.
1) Warm engine up to normal operating temperature.
2) While listening to sound of injector (2) by using
sound scope (1) or such, increase engine speed to
higher than 3,000 r/min.
3) Check to make sure that injector operation sound is
stop when throttle valve is closed instantly and it is
heard again when engine speed is reduced to
approx. 2,000 r/min or less.
I2RH01170032-
S4RS0A1704002
I2RH0B170004-

Advertisement

loading