Download Print this page

Delta ESCALDA Installation Manual page 9

Advertisement

5.5. Open a tap behind the softener so a flow runs through it. Some air
may flow from the tap; this comes from the softener. This will
happen only once; at start-up. Once only water flows from the tap,
and no more air, close the tap.
5.6. Perform a manual regeneration.
5.6.1.
Use a hex key number 5 to turn the program disk (PRG) manually.
T
u
r
n
P
R
G
c
o
u
n
ter clockwise until it is in above position. When the arrow and the
small line on the transparent cover reach the area marked by "B"
(brining), the regeneration will start. Immediately, the PRG will drop
down a little (you will be able to see and hear this). "R" stands for
refill (refilling the container with water at the end of the
regeneration stage). To make sure the softener is in regeneration,
there should be a small water flow to the drain, and the water level
in the container should drop.
5.6.2.
Let regeneration perform until it stops automatically. The estimated
time is approx. 12 minutes. When regeneration has stopped, no
more water flows to the drain. This is a clear indication that the
regeneration stage is over.
5.6.3.
Open a tap behind the softener for several minutes to allow residual
water to be flushed from the tubing.
5.6.4.
Check outgoing hardness with a "hardness test kit" (not supplied by
Delta). Adjust blending if necessary.
DELTA WATER ENGINEERING
V05/2009/P9

Advertisement

loading