Download Print this page

Delta ESCALDA Installation Manual page 8

Advertisement

5. Start up:
5.1. Leave Bypass in "bypass" mode, open main valve and flush for
several minutes in order to avoid impurities from entering the
softener. When you do not use a Bypass, open the main valve
slowly as described in 5.4.
5.2. Fill
salt
provided space. Use only specific
salt tablets that are suitable for
softeners.
5.3. Add water in the salt bin until the
water level is approx. 10cm (4")
high. (the floater on the brine
valve must be afloat)
5.4. Turn the bypass slowly to "service" mode. Open the main valve
when you do not use a Bypass.
DELTA WATER ENGINEERING
bin
with
salt
in
the
V05/2009/P8

Advertisement

loading