Configuration; Ac Site Preparation; Ac Powered Chassis Mounting - Omnitron Systems Technology 6550-0-FK User Manual

Replacement kit fast ethernet switch with 5 10/100 utp ports and 1 100base-fx fiber port
Table of Contents

Advertisement

3.0

CONFIGURATION

3.1

AC Site Preparation

Power source should be available within 5 ft. of the chassis and installed
per the National Electrical Code ANSI/NFPA-70.
This equipment requires a 100-240VAC, 0.5Amp, 50/60Hz power outlet.
Appropriate overloading protection should be provided on the AC power
source outlets utilized.
The operating temperature of this equipment is 0 to 50 degrees C. If
installed in a closed or multi-module rack assembly, the operating ambient
temperature of the rack must not exceed the maximum rated 50 degrees C.
Installation of the equipment should be such that the air flow in the front
and back of the chassis is not compromised or restricted.
Never use this equipment to carry any weight except its own. Never use it
as a shelf to support the weight of other equipment.
3.2

AC Powered Chassis Mounting

Attach the AC power cord to the back of the Power Receptacle and plug into
the AC outlet. Any installed modules will illuminate the power LED.