Heatrae Sadia Megalife CLV190 Installation Manual page 3

Cistern fed solar vented water heater
Table of Contents

Advertisement

The information contained in these instructions details how to connect the Megalife Solar water
heater to a solar primary circuit. Other controls will be necessary to provide control over the primary circuit, refer
to the instructions supplied with the solar controls and ancillary equipment for details of how to integrate them
G3 Requirements (extracts taken from G3 regulations)
(2)
A hot water system, including any cistern or other vessel that supplies water to or receives expansion water from
a hot water system, shall be designed, constructed and installed so as to resist the effects temperature and pressure
that may occur either in normal use or in the event of such malfunctions as may reasonably be anticipated, and must be
adequately supported.
(3)
A hot water system that has a hot water storage vessel shall incorporate precautions to:
(a)
prevent the temperature of the water stored in the vessel at any time exceeding 100°C: and
(b)
ensure that any discharge from safety devices and header tank is safely conveyed to where it is visible
but will not cause a danger to persons in or about the building.
In the Secretary of State's view Requirement G3(3) will be met for a hot water storage system that has a vented stor-
age vessel if:
a.
the storage vessel has a suitable vent pipe connecting the top of the vessel to a point open to the atmos-
phere above the level of the water in the cold water storage cistern and over it; and,
b.
in addition to any thermostat, either the heat source, or the storage vessel is fitted with a device that will
prevent the temperature of the stored water at any time exceeding 100°C; and,
c.
the hot water system has pipework that incorporates a provision for the discharge of hot water from the safety
devices to an appropriate place open to atmosphere where it will cause no danger to persons in or about
the building.
Vented hot water storage systems
3.12
Vented hot water storage systems should incorporate a vent pipe of an adequate size, but not less than 19mm
internal diameter, connecting the top of the hot water storage vessel to a point open to the atmosphere obove and over
the level of the water in the cold water storage sytem.
3.13
In addition to the vent pipe referred to in 3.12 and any thermostat provided to control the temperature of the
stored water to a desired temperature, vented hot water storage systems should incorporate either:
a.
for all direct heated sources, a non-self-resetting energy cut-out to disconnect the supply of heat to the
storage vessel in the event of the storage system overheating: and,
for all indirect heat sources, an overheat cut-out to disconnect the supply of heat to the storage vessel in
the event of the stored water overheating so that the temperature of the stored water does not exceed
100°C.
3.14
Vent pipes should discharge over a cold water storage cistern conforming to BS 417-2:1987. Specification for
galvanized low carbon steel cisterns, cistern lids, tanks and cylinders. Metric units; or BS 4213:2004 Cisterns for domestic
use. Cold water storage and combined feed and expansion (thermoplastic) cisterns up to 500 litres. Specification; as
appropriate.
3.15
The cold water storage cistern into which the vent pipe discharges should be supported on a flat, level, rigid
platform which is capable of safely withstanding the weight of the cistern when filled with water to the rim and fully
supporting the bottom of the cistern over the whole of its area. The platform should extend a minimum of 150mm in all
directions beyond the edge of the maximum of the cistern.
Note: When an existing metal cistern is replaced, or a plastic cistern is replaced by one with larger dimensions, the
existing support should be upgraded, as necessary, with one in accordance the paragraph 3.15.
36005941_issue_07.indd 3
Please read and understand these instructions before starting work.
with the Megalife Solar unit.
Please leave this leaflet with the user following installation
Megalife Product Guide
3
07/09/2017 08:40:30

Advertisement

Table of Contents
loading

This manual is also suitable for:

Megalife clv210Megalife clv250Megalife clv300

Table of Contents