1MRK 505 372-UEN A
9.8.2.2
9.8.3
9.8.3.1
Busbar protection REB670 2.2 IEC
Commissioning manual
IEC15000029 V1 EN-US
2.
Exit back to the root menu.
3.
Select Yes in the save dialogue box.
Once the IED is in test mode the yellow Start LED starts to blink.
Enable forcing using TESTMODE function block
•
Use the TESTMODE function block, appropriately configured in PCM600/
ACT.
It may be convenient to control the input on mentioned component from, for
example, an LHMI function key or similar during commissioning to quickly and
easily enter IED test mode.
How to change binary input/output signals using forcing
Once the IED is in IED test mode, the LHMI/PCM600 menus can be used to
control input/output signals freely.
Forcing by using LHMI
Editing a signal value directly
•
Edit the input/output value directly to select the desired logical level, by doing
following:
1.
Select the value line of the desired signal, see figure 10.
2.
Press the Enter key to edit the value.
Section 9
Testing IED operation
GUID-DD17B7D6-516F-4561-9D30-906B968EAFE0 v1
GUID-7DF9FAF1-68B1-49AF-9DE4-2A8D6F6FAEFE v1
GUID-D885671F-79E5-4B75-8777-B59E44F6FCFC v1
GUID-E0C115BE-3AD1-48C7-BA2D-29857CD3D3ED v1
75