ABB REB670 Commissioning Manual page 123

Relion 670 series busbar protection version 2.2 iec
Hide thumbs Also See for REB670:
Table of Contents

Advertisement

1MRK 505 372-UEN A
Busbar protection REB670 2.2 IEC
Commissioning manual
Testing functionality by secondary injection
UL1
UL2
UL3
UN
IEC07000106 V2 EN-US
Figure 14:
Connection of the test set to the IED for test of U1 block level
where:
1
is three-phase voltage group1 (U1)
2
is three-phase voltage group2 (U2)
3.
Decrease slowly the voltage in phase UL1 of the test set until the START
signal resets.
4.
Check U1 blocking level by comparing the voltage level at reset with the set
undervoltage blocking U1Low.
5.
Repeat steps
2
to
4
The connections to U1 must be shifted to test another phase.
(UL1 to UL2, UL2 to UL3, UL3 to UL1)
Check of U2Low
Procedure
1.
Connect voltages to the IED according to valid connection diagram and
figure 15.
to check U1Low for the other phases.
Section 10
UL1
UL2
1
UL3
UN
UL1
2
UL2
UL3
IEC07000106-1-en.vsd
SEMOD175258-91 v3
117