Installation
Verifying the installation
To verify that the HBA is properly installed and is operating:
1. Turn on the computer.
2. At power up, observe the Power On Self Test (POST) LED indicators on the
Table 4: Normal POST LED indicators
Amber LED (L1)
Flashing (irregular)
Slow blink (1 Hz)
Fast blink (4 Hz)
Off
Configuration guidelines
The driver is provided as part of Tru64 or Open VMS, or as part of their
associated patch kits. For information on supported configurations specific to
your operating system and topology, refer to:
22
FCA2684/FCA2684DC PCI-X Host Bus Adapters for OpenVMS and Tru64 UNIX Installation
HBA. The position of the POST LED indicators is defined in
page 13 and
Table 2
and the amber LED signifies port activity. The amber LED blinks at all times
during normal operation.
installation.
Green LED (L2)
Off
On
On
Blink (1 Hz)
FCA2684/FCA2684DC PCI-X Host Bus Adapters for Open VMS and Tru64
Release Notes
HP StorageWorks SAN Design Guide available at
http://h18006.www1.hp.com/storage/saninfrastructure.html.
on page 13. The green LED indicates power functions,
Table 4
lists indications you may see after
POST processing in progress
Normal—1 Gb link rate
Normal—2 Gb link rate
Normal—link down or not yet started
Amber LED (L1)
Green LED (L2)
State
Figure 1
on
State
Guide