2.

Site Preparation

Provide drainage, potable water supply and electrical power to within 6 feet (2m) of
ice machine in accordance with local and national codes. Outdoor installation is not
recommended and will void warranty.
2.1

Installation site requirements

Electrical
§ This appliance should be connected by a qualified person in accordance with application codes.
§ If the supply cord is damaged, it must be replaced by the manufacturer, its service agent or similarly qualified
persons in order to avoid a hazard.
MCD425(A/W)BS 115/60/1 (115 V ±10%) 15A breaker
(MCD requires a 15A dedicated circuit)
* Requires a 15A dedicated circuit.
Potable Water Supply
10 psi to 70 psi (69 kpa to 483kpa)
Condenser water supply for water-cooled systems
10 psi min.; 125 psi max. (69 kpa min.; 862 kpa max.)
20 F to 90 F (–7 C to 32 C)
0.5 gallons (1.9 liters) per minute
Drain
The drain line from the ice machine must have at least 1/4 in. per foot (6,4 mm/0,3 m) pitch
Bin  •  RIDE Technology 
115 V ±5%
230 V ±10%
220 V ±10%
115 V
NEMA
5-15
WARNING!
MCE425(A/W)BS (230/50/1 - 5.5A (full load)
(MCE425A/W requires a dedicated circuit, 1.50 mm
MCC425(A/W)BS (220/60/1 - 5.5A (full load)
(MCE425A/W requires a dedicated circuit)