JADAC Power Support
3.0

OPERATING PROCEDURES

It is recommended that one carefully considers all actions that involve switching
the circuit breakers as indiscriminate switching can result in loss of load.
3.1

Circuit breaker layout

The circuit breaker layout is shown below.
3.2

Initial startup

Close Rectifier Input (CB1).
Close Reserve Input (CB2).
After a short time period the display will power up.
Confirm: "Load on Static Bypass" is displayed
Close Load Output Isolator (SW1).
Open Manual Bypass (CB3).
Close Battery Fuses.
On Display Select:
Confirm: "No Active Alarms" is displayed within approx. 20 sec.
3300 UPS Manual
Circuit breaker layout
Page 8 of 24