Wiring Work - Samsung ND220HHXCE User & Installation Manual

Nd***hh series duct type series
Table of Contents

Advertisement

Wiring work

Power and communication cable connection
1. Before wiring work, you must turn off all power source.
2. Indoor unit power should be supplied through the breaker ( ELCB or MCCB+ELB ) separated by the outdoor power.
ELCB: Earth Leakage Circuit Breaker
MCCB:Molded Case Circuit Breaker
ELB:Earth Leakage Breaker
3. The power cable should be used only copper wires.
4. Connect the power cable{1(L), 2(N)} among the units within maximum length and communication cable(F1, F2) each.
5. Connect V1, V2(for DC12V) and F3, F4(for communication) when installing the wired remote control.
Outdoor Unit
220-240V~
MCCB+
or
ELCB
ELB
Indoor Unit 1
❋ ❋ ELCB : Essential Installation
WARNING :
Power off before connecting any wires;
Indoor PBA will be damaged while V1,V2,F3,F4 short each other.
Connecting power for optional product
f When installing optional product, make sure to follow below current capacity.
X
❋ ❋ Optional product is not supplied by manufacturer.
POWER : L
POWER : N
OPTION
VENTILATOR
AC, Below 2A
28
Big Duct_IBIM_E_33766-3.indd 28
Wired Remote
Indoor Unit 2
Indoor Unit 3
T/B
1(L)
2(N)
Vc
Control
Vc
Vw
Vw
HOT
COIL
AC, Below 2A
2012-01-13 오후 9:40:32

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nd280hhxce

Table of Contents