Package Contents; Installing The Power Optimizer; Step 1, Mounting And Grounding The Power Optimizers - SolarEdge Power Optimizer Installation Manual

Dc-dc converter
Table of Contents

Advertisement

Package Contents

Power optimizers
Datasheet
This manual
Grounding washers (North America only)

Installing the Power Optimizer

Step 1, Mounting and Grounding the Power Optimizers

1
Use the power optimizer mounting brackets to attach the power optimizer to the racking, as
described below.
2
Determine the power optimizer mounting location.
3
If required, mark all mounting hole locations and drill the holes.
CAUTION:
Do not drill through the power optimizer or through the mounting holes. The drilling vibrations
can damage the power optimizer and will void the warranty.
Ne pas percer à travers la optimiseur de puissance ou ses trous de fixation. Les vibrations qui
en résulteraient peuvent endommager la optimiseur de puissance.
4
Attach each power optimizer to the rack using the 5/16'' or 1/4'' screws and washers.
5
For North America only - use the following methods to ground the power optimizer:
For mounting on a grounded metal rail: Use the provided 5/16'' stainless steel star washer between
the railing and the flat side of the mounting bracket. The grounding washer should break through the
anodize coating of the railing to ensure low-resistive connection. Apply torque of 9.5 N*m / 7 lb*ft.
Star
washer
Figure 4: Power optimizer grounding using the star washer
12
SolarEdge Power Optimizers Installation Guide – MAN-01-00112-1.2
Chapter 3: Power Optimizer Installation
Mounting Bracket

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents