Installing the Chassis
• You have the following equipment in addition to the switch and the kits shipped with the switch:

Unpacking and Inspecting the Chassis

Caution
When handling switch components, such as fan or power supply modules, wear a grounded ESD strap
and handle the modules by their carrier edges only. To ground the ESD strap, make sure that it is attached
to an earth ground, a grounded chassis, or a grounded rack.
Tip
Keep the shipping container in case the chassis requires shipping in the future.
The switch is thoroughly inspected before shipment. If any damage occurred during transportation or any
Note
items are missing, contact your customer service representative immediately.
Warning
Statement 1005—Circuit Breaker
This product relies on the building's installation for short-circuit (overcurrent) protection.
Ensure that the protective devices is rated not greater than 40A.
◦ There is adequate clearance around the rack to install the switch and to allow for unimpeded airflow.
◦ Eight customer-supplied 12-24 or 10-32 screws (required for attaching slider rails and mounting
bracket to the mounting rails)
◦ Number 1 and number 2 Phillips screwdrivers with torque capability
◦ 3/16-inch flat-blade screwdriver
◦ Tape measure and level
◦ ESD wrist strap or other grounding device (wrist strap can be found in the accessory kit)
◦ Antistatic surface large enough to place the switch
◦ Grounding cable (6 AWG recommended), sized according to local and national installation
requirements; the required length depends on the proximity of the switch to proper grounding
facilities
◦ Crimping tool large enough to accommodate the girth of the grounding lug
◦ Wire stripping tool
Unpacking and Inspecting the Chassis
Cisco Nexus 3600 Hardware Installation Guide
9