Bunn My Cafe AP Technical Training Manual page 18

Table of Contents

Advertisement

The Ejector assembly is a critical component used to align the pod holder in different placement positions. The place-
ment positions are: load, brew, eject and set back positions. The index motor rotates the position disc and pod holder
forward and backward at different intervals. The position disc is slotted and rotates between the index sensor. The
index sensor monitors the slots and stops the index motor at the correct placement position for the pod holder during
the entire brew process from start to finish.
Pod Holder or Index Motor Position during Brew Cycle
Step 1: Depress the open/close button and pod holder rotates outward to coffee pod load position.
Step 2: Depress the open/close button and the pod holder rotates back in and stops in the brew position
(under sprayhead assembly).
Step 3: After brewing is complete, the pod holder rotates further back and down to coffee pod eject position.
Note: The coffee pod eject has an option of making a single or double attempt of ejecting the pod in the
programming menu.
Step 4: After ejecting the coffee pod, the pod holder rotates forward by a set time built in the software
(approx. 5 seconds) and stops at the set back position from the sprayhead assembly and is ready for the
next brew command.
18
My Caf é AP Training Manual
Load Position - Sensor Unblocked
Brew or Home Position - Sensor Unblocked
Dump Position - Sensor Blocked

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents