Test Operation; Test Operation Using Pcb (Outdoor Unit); Test Operation Using Remote Controller; Check List - Fujitsu ARXC36L Installation Manual

Vrf system indoor unit duct type
Hide thumbs Also See for ARXC36L:
Table of Contents

Advertisement

00
Enable
01
Disable
Filter
indicator
13
Display
action
only on
02
central
remote
control
00
Default
Horizon-
tal swing
24
01
Left half
airflow
direction
02
Right half
00
Default
Cool air
tem-
30
01
Adjust (1)
perature
trigger
02
Adjust (2)
00
Default
Hot air
01
Adjust (1)
tem-
31
perature
02
Adjust (2)
trigger
03
Adjust (3)
00
Enable
Auto
40
restart
01
Disable
00
Start/Stop
External
46
control
Emergency
01
stop
00
All
Error
Display
report
47
only on
target
01
central
remote
control

8. TEST OPERATION

] 1
8.1. Test operation using PCB (Outdoor
unit)
• Refer to the Installation Manual for the outdoor unit if the
PCB for the outdoor unit is to be used for the test operation.

8.2. Test operation using remote controller

• Refer to the Installation Manual for the remote control unit to
perform the test operation using the remote control unit.
• When the air conditioner is being test run, the OPERATION
and TIMER indicator lamps flash slowly at the same time.
For details, please refer to the Manual of "IR Receiver Unit" or
"Wired Remote Controller".
Enable or disable the filter
indicator. Setting 02 is for use
with a central remote control.
Adjust the horizontal swing airflow
direction.
(For horizontal swing equipped
models)
Adjust the cool air trigger
temperature. To lower the trigger
temperature, use setting 01. To
raise the trigger temperature, use
setting 02.
Adjust the hot air trigger
temperature. To lower the trigger
temperature by 6 degrees C, use
setting 01. To lower the trigger
temperature by 4 degrees C, use
setting 02. To raise the trigger
temperature, use setting 03.
Enable or disable automatic
system restart after a power
outage.
Allow an external controller to
start or stop the system, or to
perform an emergency shutdown.
* If an emergency shutdown is
performed from an external
controller, all refrigerant systems
will be disabled.
Change the target for reporting
errors. Errors can either be
reported in all locations, or only
on the wired remote.

9. CHECK LIST

Pay special attention to the check items below when
] 1
installing the indoor unit(s). After installation is complete, be
sure to check the following check items again.
Check items
Has the indoor unit
been installed correctly?
Has there been a
check for gas leaks
(refrigerant pipes)?
Has heat insulation
work been completed?
Does water drain easily
from the indoor units?
Is the voltage of the
power source the same
as that indicated on the
label on the indoor unit?
Are the wires and
pipes all connected
completely?
Is the indoor unit
grounded?
Is the connection cable
the specified thickness?
Are the inlets and outlets
free of any obstacles?
After installation is
completed, has the
proper operation
and handling been
explained to the user?
If not performed
correctly
Vibration, noise,
indoor unit may drop
No cooling, No heating
Water leakage
Water leakage
No operation, heat
or burn damage
No operation, heat
or burn damage
Short circuit
No operation, heat
or burn damage
No cooling, No heating
Check
box
En-13

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Arxc60lArxc72lArxc90l

Table of Contents