SoftBank 708SC User Manual page 424

Hide thumbs Also See for 708SC:
Table of Contents

Advertisement

Tip
• Operation procedures
25
Procedures can be found in the SoftBank Website
(http://www.softbank.jp).
• Connection fees
Connection fees do not apply to updates (including
checking for updates, downloading, and rewriting).
25-12
• Scheduled update time comes
Confirmation window appears at scheduled update
time. Press c or wait approximately ten seconds to
start. Update will not start while 708SC is in use. When
the current operation ends, confirmation window
appears. But other functions active, and ten minutes
after scheduled update time, scheduled update is
automatically canceled.
Notification Window
• To cancel Schedule update
a Perform Steps 1 to 5, select Cancel schedule
b Press w (Yes)

Advertisement

Table of Contents
loading

Table of Contents