Installing Engine Piping, Tubing, And Control Linkages - Model Airways CURTISS JN-4D JENNY Instruction Manual

Table of Contents

Advertisement

attach to the upper fuselage strut fittings at
Station 2 and are secured at the clips molded
into the sides of the radiator. Cut a rabbet in
the end of the strut to accept the clip on the
radiator as shown in the figure and on the plan.
4. Installing Engine Piping,
Tubing, and Control Linkages
The plans show most of the basic items and
they are described below. What's missing are
some details such as small switches, wiring
to switches, magneto, and tachometer cable.
To be honest, no plans or details were found
describing these specific items, but they are
really considered insignificant for the model.
Tubing for the oil pressure gauges and
tubing for the water temperature gauge
(Figure 5-16):
For the oil pressure gauge
tubing, use 0.025"-diameter copper wire to
represent the tubing. The wire is located on
the right side of the fuselage and runs from
the oil pump under the engine to the rear
cockpit oil pressure gauge, with a feed off
to the front cockpit gauge. The wire can be
secured in place with some small brass sta-
ples, or just glue at several spots.
For this and other tubing, notice the coils
at some ends that provide for expansion of
the tubing.
For the water temperature gauge tubing, use
0.015"-diameter copper wire to represent the
tubing. The wire is located on the left side of
the fuselage and runs from the pin at the top
of the radiator to the water temperature
gauge in the rear cockpit.
Flex tubing from the radiator to the
engine water outlet pipes (Figure 5-17):
Use flexible PVC tubing between the radiator
water inlet pins and the water outlet pipes on
the engine. There is one on each side. Paint
the clear tubing black.
Outlet water piping from the radiator to
water pump (Figure 5-18):
pipe (E34) runs on the left side of the engine
from the bottom of the radiator to the engine
water pump. Hang the pipe with a brass strap
from the left engine bearer. Connect the end
of the pipe to the radiator with a short sec-
tion of PVC tubing.
Flex air heater tubing from the exhaust
manifolds, and water tubing from the
V intake manifold to the water pump
(Figure 5-19):
Use clear PVC tubing from
the two angled openings at the base of the
carburetor up to the pins on the underside
of both exhaust manifolds. Since these tubes
are actually metal flex tubes, paint the tubing
silver. These tubes provide heat from the
exhaust to the carburetor.
The V intake manifold is a water-jacketed
unit. Rubber tubes on each side provide
water to the manifold from the water
pump. These could not be installed initially
on the engine because they must go around
the transverse engine-bearer support beam,
as does the lower inlet water pipe. These
can be installed using copper wire. Fit the
wire between the holes you drilled on the
OIL PUMP AT BOTTOM
OF ENGINE
FIG. 5-17 WATER OUTLET
TUBING TO RADIATOR
PIN WATER INLET
The lower water
1. MARK TAPER AND CUT TO SHAPE
2. MARK LEADING AND TRAILING EDGES
9 LASER-CUT WOOD LAMINATES
PROVIDED – 1/32" THICK – E44
3. CARVE SHAPE
REFER TO PATTERNS
ON PLAN SHEET 1
FIG. 5-16 OIL & WATER LINES TO COCKPIT GAUGES
OIL PRESSURE GAUGE
.025"-DIA. COPPER WIRE
ENGINE BEARERS
WATER OUTLET AT TOP OF RADIATOR
ON RADIATOR
(BOTH SIDES)
FIT FLEX
TUBING
(BOTH SIDES)
PAINT BLACK
SEE FIG. 5-16
WATER OUTLET PIPE
E26B ON TOP OF
ENGINE CYLINDERS
FIG. 5-19 AIR HEATER & WATER TUBING
EXHAUST MANIFOLD
PIN UNDER
FLEX TUBING –
PAINT SILVER TO
REPRESENT A
METAL FLEX TUBE
ON BOTH SIDES
CARBURETOR
FIG. 5-20 PROP CONSTRUCTION
DOWEL FOR ALIGNMENT
WHILE GLUING
29
OIL PRESSURE GAUGE
.015"-DIA. COPPER WIRE
STAPLE, TAPE, OR GLUE COPPER WIRES
TO OUTSIDE OF ENGINE BEARERS
AND UNDER OR ALONGSIDE OF
LONGITUDINALS AS NECESSARY
TO HOLD WIRES IN PLACE
FIG. 5-18 WATER PIPE –
RADIATOR TO WATER PUMP
NOSE
PLATE
LEFT ENGINE
BEARER
WATER
BRASS
OUTLET
SUPPORT
PIN
STRAP
WIRE PIPE
FLEX
CASTING E34
TUBING
PAINT
BLACK
RADIATOR
THIS WIRE SHOWN ON
FIG. 5-10 AT OTHER END
V INTAKE MANIFOLD
GLUE 8 OR 9 LAMINATES – FINISHED
THICKNESS SHOULD BE 9/32"
HUB E19
4. INSTALL
PROP
WATER
TEMPERATURE
GAUGE
WATER PUMP
FIT
TO
PIN ON
PUMP
PUT ANOTHER BRASS
STRAP ON OTHER
SIDE OF BEAM
ENGINE BEARER
SUPPORT BEAM
.025"-DIA. COPPER WIRE
(BOTH SIDES)
COPPER PAINT
OR TAPE AT TIPS
CLAMP PLATES E18

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ma1010

Table of Contents