Eastwood VERSA CUT60 User Manual page 7

Table of Contents

Advertisement

INSTALLATION
Air regulator installation and operation
1.
Firmly tight and seal the copper air hole at IN and OUT terminal . by high pressure
rubber tube firmly .
2.
Tight and seal the meter with meter face rubber tube.
3.
Fix the connecting shelf with screw as the regulator position.
4.
Get down the plastic screw and fix the regulator on the shelf.
5.
Turn on the air valve, turn up the pressure adjusting knob, Turn the pressure to rated
volume(meter inside shows KG), and then put down the knob.(+ means increasing
pressure, -- means decreasing pressure.)
6.
Scale of the meter is as follow.The
volume in the picture is 6 kg.
7.
If the water in the gas filtering bottle is too much, please turn on the water valve to let
the water go out.
Regulator
installation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Versa cut80Versa cut100Versa cut160

Table of Contents