Installation; Installation Preparation - Huawei eA360 Series User Manual

Cpe
Table of Contents

Advertisement

CPE eA360 Series
User Guide
About This Chapter
This section describes how to install the eA360s.

3.1 Installation Preparation

Before you install the eA360, unpack and inspect the equipment delivered to the site and
prepare the related tools.
should keep at least 20 meters to the roadways or in locations where it can be shown that the
ground power level of -44 dBm in the A or B blocks or -55 dBm in the C or D blocks in part
27 will not be exceeded at the nearest road location.
Prerequisites
Perform the following operations to inspect the goods delivered to the site:
1.
2.
3.
Precautions
Installation Tools
Table 3-1 lists the tools used for installing the eA360.
Issue 01 (2014-07-30)
he product must be installed by professional, and the distance
T
Unpack the equipment, count the total number of items based on the packing list
attached to each packing case, and check whether each packing case is intact.
Check whether the models and quantities are consistent with those specified on the
Packing List.
Record the serial number of the CPE.
Power on an CPE within 24 hours after unpacking it. If you power off an CPE for
maintenance, restore power to the CPE within 24 hours.
To avoid direct lightning, CPE must be installed in the protection angle of 45 degrees
below a separate lightning rod, or protection angle of 45 degrees below a surrounding
high-rise building.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3

Installation

3 Installation
10

Advertisement

Table of Contents
loading

Table of Contents