174
C
8: O
HAPTER
PTIMIZING A
N
P
ETWORK
LAN
2 Select the scope for the work order.
You can select the network plan, a site, a building, or an individual floor.
3 Select the language: English or German
4 To change the output directory for the report, click on the button next to
output directory, navigate to the new directory, and click Select.
5 Click Generate.
6 When the report is generated, click View.
A browser window containing the report opens.
7 Click View Site Survey Order to view the site survey work order.
Need help?
Do you have a question about the 3CRWX120695A and is the answer not in the manual?