vita Vacumat 300 Operating Manual

vita Vacumat 300 Operating Manual

Dental porcelain furnace

Advertisement

VITA - Vacumat 300
Operating Manual
6:00 min
600°C
1:00 min
930°C
055°C/min
6:00 min
600°C
500°C
1 2 3
4 5
7 8
6
9
0
#

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Vacumat 300 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for vita Vacumat 300

  • Page 1 VITA - Vacumat 300 Operating Manual 500°C 1 2 3 1:00 min 930°C 055°C/min 6:00 min 600°C 6:00 min 600°C...
  • Page 2: Table Of Contents

    Installation / Standby temperature ......................3 Main menu / Selecting a programme...................... 3 Option menu ............................. 4 Selecting programs / Checking parameter .................... 4 Entering / Altering parameters:....................... 5 Firing cycle charts............................ 6 39/03/04 Vita Zahnfabrik H.Rauter GmbH&Co.KG 79704 Bad Säckingen...
  • Page 3: Technical Data

    1 Vacuum pump (optional) 1 firing tray 1 Mains power lead 1 pair of furnace tweezers 1 pack of crown stands A/B, grey 1 pack porcelain trays G, grey 1 Operating Instructions 1 Guarantee Card 39/03/04 Vita Zahnfabrik H.Rauter GmbH&Co.KG 79704 Bad Säckingen...
  • Page 4: Controls And Display

    When the firing tray lift is in a low position, the selection of this item activates the vacuum pump. The furnace is cooled to standby temperature minus 50°C, and subsequently heated to standby temperature which is then held. 39/03/04 Vita Zahnfabrik H.Rauter GmbH&Co.KG 79704 Bad Säckingen...
  • Page 5: Option Menu

    4. Check time and temperature parameters shown on display, and strat program by pressing START (8). The selected program is run with parameters shown on the display. A program may be aborted at any time by pressing STOP (9). Entering / altering parameters: see ENTERING /ALTERING PARAMETERS 39/03/04 Vita Zahnfabrik H.Rauter GmbH&Co.KG 79704 Bad Säckingen...
  • Page 6: Entering / Altering Parameters

    The desired item is selected using the cursor keys. Alternations of time or temperature parameters are entered using the numericial block (10), and entries saved using key #. When END is pressed, the selected program is run with the set cooling parameters. 39/03/04 Vita Zahnfabrik H.Rauter GmbH&Co.KG 79704 Bad Säckingen...
  • Page 7: Firing Cycle Charts

    6.00 6.00 1.00 6.00 Glaze firing Glaze firing 0.00 3.00 1.00 Glaze firing, using Glaze firing 4.00 4.00 1.00 VITACHROM „L“ Fluid GLAZE firing, using Glaze firing 4.00 3.00 1.00 „725“ glaze 39/03/04 Vita Zahnfabrik H.Rauter GmbH&Co.KG 79704 Bad Säckingen...
  • Page 8 Menu: Miscellaneous Item 6 FACTORY CALIBRATION: Final temperature: approx. 1040 °C Pre-drying time: 2.00 minutes Rise time: 6.00 minutes Hold time: 1.00 minutes When firing is lowered, place solder in joint gap using dispenser. 39/03/04 Vita Zahnfabrik H.Rauter GmbH&Co.KG 79704 Bad Säckingen...
  • Page 9 6.00 1.00 6.00 Glaze firing Glaze firing 0.00 3.00 1.00 Glaze firing, using Glaze firing 4.00 3.00 1.00 VITACHROM „L“ Fluid Glaze firing, using Glaze firing 4.00 3.00 1.00 „725 “ glaze 39/03/04 Vita Zahnfabrik H.Rauter GmbH&Co.KG 79704 Bad Säckingen...