Operating the OptiView XG on Battery Power
The OptiView Power Control screen will appear, as shown.
2. Switch off Wireline Ports A, B, C, and D. This will approximately double
battery operation time.
3.The system must reboot to make the change. Select the Save and Restart
button.
Note
Remember to switch on Wireline Ports A, B, C, and D before attempting to use the Network Ports!