Powering On - Fluke OPTIVIEW XG Getting Started Manual

Network analysis tablet
Table of Contents

Advertisement

Powering On

1. Connect the AC adapter to a power source and to the OptiView XG Network Analysis Tablet.
See Figure 8, "Powering On" for the location of the power connector and power button.The
batteries are not fully charged before shipment due to transportation regulations.
2. Charge the batteries to full capacity before disconnecting the AC adapter. Charge time is
approximately 3 hours. Run time is approximately 2 hours with fully charged batteries.
• If the OptiView XG is powered-on, see the Battery Status Window (see page 28) to verify
that batteries are fully charged.
• If the OptiView XG is powered-off use the Battery Charge Status LED (see page 27) or the
Battery Charge Indicators on the batteries (see page 28) to verify that batteries are fully
charged.
3. Press the green On/Off button to power-on the OptiView XG.
The OptiView XG will power-up. The following screens will be displayed during power up:
1. Blank screen.
2. Fluke Networks splash screen.
3. Windows 7
operating system startup screens.
4. Fluke Networks desktop background.
Figure 8. Powering On
Power connector
Power button
GLZ04.EPS
Powering On
13

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the OPTIVIEW XG and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF