Export - PDC spas SYNERGY Series FX15 Owner's Manual

Hide thumbs Also See for SYNERGY Series FX15:
Table of Contents

Advertisement

Wiring Guidelines—Op onal for TruSwim® Propulsion System (50 Hz) Export
 
All installa ons and connec ons are to be performed by a qualified, licensed electrician only  
and in accordance with the Na onal electric code and all applicable local regula ons.    
Your new TruSwim Swim Spa will arrive from the factory wired to operate with a single phase 230 Volt 32 Amp Residual
Current Device, RCD current device (not supplied by PDC) from the homeowner's power source.
The system, when wired this way, is designed to turn off the high speed of the jet pump and heater while the TruSwim
propulsion system is opera ng. Since water cools slowly, this is adequate for most installa ons.
If you choose, the swim spa can be wired with an addi onal 230 volt 32 amp Residual Current Device Protected (not
supplied) power source from the home owners electrical power. The addi on of the 32 amp circuit will allow the high
speed of the jet pump and the heater to operate simultaneously with the TruSwim propulsion system a er a programming
change is made to the opera ng system of the swim spa. This programming change is not supplied with this manual due to
the possibility of other features being changed accidentally. Your swim spa retailer should have the informa on needed to
make the necessary programming change. In the event he does not or no retailer is available contact our customer service
for assistance.
Steps for Adding Addi onal Power Supply 
1. Make sure all electrical power is turned off before performing service.
2. Disconnect and remove wire #1 from both the relay center and spa control center. See figure #1 and figure #2.
3. Install the 32 amp 230 volt RCD protected 230volt line and neutral wire into the fuse block and the ground wire
in the ground strip where the wire was removed from the relay control center as shown in figure #3.
4. Place a cap into the hole le behind from the removal of wire #1 in the spa control center.
5. FOLLOW ALL OTHER START UP PROCEDURES WITHIN THIS MANUAL. 
Remove wire #1
Remove Strain
Relief and cap
remaining hole
Remove wire #1
FOR QUALIFIED ELECTRICIAN REFERENCE ONLY!  
Ensure power is turned off prior to making any electrical connec ons. 
FIGURE #2 
FIGURE #1 
230 volt line &
neutral line
connec on
32 amp 230 volt
residual current
device
protected feed
31 
FIGURE #3 

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents