Step 2: Protect Against Electrostatic Discharge

WARNING:
Static electricity can harm delicate components inside your system.To prevent
static damage, discharge static electricity from your body before you touch
any of the electronic components, such as the microprocessor. You can do
so by periodically touching an unpainted metal surface on the switch.
You can also take the following steps to prevent damage from electrostatic discharge (ESD):
When unpacking a static-sensitive component from its shipping carton, leave it in the antistatic package
until you are ready to install it. Just before unwrapping the antistatic package, discharge static electricity
from your body.
Before moving a sensitive component, place it in an antistatic container or package.
Handle all sensitive components in a static-safe area. If possible, use antistatic floor pads, workbench
pads, and an antistatic grounding strap.

Step 3: Unpack the Switch

The following figure shows the package contents for the switch.
Figure 3. Switch package contents
Check the contents of the boxes to make sure that all items are present before installing the switch.