PeerlessBoilers PF-50 Installation, Operation & Maintenance Manual page 59

Table of Contents

Advertisement

1
Tank, Condensate Neutralizer
Neutralizer, Bag
2
Cap, Neutralizer Tank
3
Clamp, 3/4" ID Tubing
4
Pre-formed 3/4" ID Tubing, Tank to Jacket, with (2) clamps
5
Tubing, 3/4" ID x 1/8" Wall PVC, 19.5" LG
6
Tank, Condensate Collector
7
Condensate Switch Float Assembly with Cap
8
Tubing, 3/4" ID x 1/8" Wall PVC, 6.5" LG
9
Clamp, 5/8" ID Tubing
10
Tubing, 5/8" ID x 1/8" Wall PVC
Description
Quantity
Stock Code
Required
1
1
1
4
1
19.5"
1
1
6.5"
2
9.5"
REPAIR PARTS
54121
54159
5430
54138
54172
5417
54120
54137
5417
54139
5416
57

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pf-80Pf-110Pf-140

Table of Contents