PeerlessBoilers PF-50 Installation, Operation & Maintenance Manual page 52

Table of Contents

Advertisement

MAINTENANCE
f. Turn the power to the P
display module to assure proper operation.
g. Initiate a call for heat** and observe the
condensate flow.
h. Reconnect the condensate piping to the drain
connection.
**NOTE: When firing the boiler the first few
times you may experience some fluttering of
the gas burner that may result in a flame
lockout. This is normal and will require you
to recycle the unit until this clears up. This
is caused by water still present in the
combustion chamber.
50
on. Observe the
UREFIRE
6. Inspect exhaust vent and air intake vents for proper
support and joint integrity. Repair as necessary. Refer
to Section 5, VENTING.
WARNING
Leaks in the vent system will cause products of
combustion to enter structure (vent system operates
under positive pressure).
7. Inspect exhaust vent and air intake vent terminations
for obstructions.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pf-80Pf-110Pf-140

Table of Contents