Rheem RGPE series Installation Instructions Manual page 28

2 stage, 80+ gas furnaces
Table of Contents

Advertisement

OPERATION WITH SELECTED ACCESSORIES
METHOD
BLOWER
ACTIVATION
BLOWER
RUNS
A
(Y1)
BLOWER
DOES NOT
B
RUN
(Y2)
28
CONTACTS
NORMALLY
When 24 VAC is applied to Y1 at the furnace control in a
OPEN
communicating system a SYSTEM BUSY message appears on
the thermostat. When the SYSTEM BUSY message appears the
outdoor unit will shut down and the indoor unit will continue
to run at first stage cooling airflow.
NORMALLY
If the device does not have normally open contacts an
CLOSED
additional relay must be used for proper system operation.
NORMALLY
When the device is connected to Y2 and a fault occurs the
OPEN
blower will shut down. The Y2 input can still be used with
normally open or normally closed contacts.
NORMALLY
If the device does not have normally open contacts an
CLOSED
additional relay must be used for proper system operation.
WIRING CONFIGURATION

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rgle series

Table of Contents