Concluding System Installation - Bosch SE 220 LSNi Installation Manual

Smartkey arming device
Table of Contents

Advertisement

Concluding System Installation

1. Make sure that bridge B1 on the control unit is closed for normal operation. Replace the con-
trol unit cover.
2. Make sure the red and green LEDs on the reader are off (= normal operating condition).
3. Arm and then disarm each key (see following chapter) to make sure that the programming is
correct. Inform the operator of this step in advance to avoid any unnecessary interruption of
operations.
Note: The bolt will engage when the bolt contact is closed as long as the magnetic contact (PL1)
is closed.
Installation Instructions
25

Advertisement

Table of Contents
loading

Table of Contents