Download Print this page

Arrow Storage Products BWG54 Owner's Manual & Assembly Instructions page 9

Advertisement

BI09
The Base For Your Building
No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is
recommended as an e ective method of properly securing your building after assembly is complete.
OPTION 1: Directly on ground (earth)
Assemble your building directly on level ground (grass, dirt, rock, sand, etc.). If you choose this option Arrow has a simple kit available to
provide a oor inside the shed to keep stored items o the ground. This kit can be used to support a plywood oor (wood not included)
or be lled with sand/rock to provide a solid surface. (Order No. FB5465)
Allow 1 - 2 hours for construction.
OPTION 2: Wood Platform
If you decide to build your own base, be sure to select the appropriate materials.
These are the recommended materials for your base:
2 x 4's (38 mm x 89 mm) Pressure Treated Lumber
5/8" (15,5 mm) 4 x 8 (1220 mm x 2440 mm) Plywood-exterior grade NOTE: Pressure Treated Lumber must not be used where it
will make contact with your storage building. The properties of Pressure Treated Lumber will cause accelerated corrosion.
If Pressure Treated Lumber comes in contact with your storage building your warranty will be voided.
10 & 4 penny Galvanized Nails Concrete Blocks (optional)
The platform should be level and at (free of bumps, ridges etc.)
to provide good support for the building. The necessary materials
may be obtained from your local lumber yard.
To construct the base follow instructions and diagram.
Construct frame (using 10 penny galvanized nails)
Measure 16"/24" (40,6 cm/61,0 cm) sections to construct
inside frame (see diagram)
Secure plywood to frame (using 4 penny galvanized nails)
Allow 6 - 7 hours for construction.
OPTION 3: Concrete Slab
The slab should be at least 4" (10,2 cm) thick. It must be level and at to provide good support for the frame.
The following are the recommended materials for your base.
1 x 4's (19 mm x 89 mm) (will be removed once the concrete cures)
Concrete Sheet of 6 mil plastic
We recommend for a proper strength concrete to use a mix of:
1 part cement 3 parts pea sized gravel 2 1/2 parts clean sand
Prepare the Site/Construct a Base
1. Dig a square, 6" (15,2 cm) deep into the ground (remove grass).
2. Fill up to 4" (10,2 cm) in the square with gravel and tamp rm.
3. Cover gravel with a sheet of 6 mil plastic.
4. Construct a wood frame using four planks of 1x4 (19 mm x 89 mm)
lumber.
5. Pour in concrete to ll in the hole and the frame giving a
total of 4" (10,2 cm) thick concrete. Be sure surface is level.
Allow 3 - 5 hours for construction and a week for concrete curing time.
Base
FRONT
(DOOR)
Note: Platform/Slab will extend 9/16" (1,4 cm) beyond oor
frame on all four sides. Seal this 9/16" (1,4 cm) of wood with a
roo ng cement (not included), or bevel this 9/16" (1,4 cm) of
concrete when pouring, for good water drainage.
FRONT
(DOOR)
Note: Finished Slab dimensions, with lumber removed.
9

Advertisement

loading

This manual is also suitable for:

Bww54Bw54-aYl54Bw54bqBwge54