Boiler Housing Panels For Taurus Dual And Taurus Dual Hr 500÷1300 (Fig. 10) - Nova Florida Taurus Dual 70 Installation, Use And Maintenance Manual

Pressurised steel boiler
Table of Contents

Advertisement

4.2.
Boiler housing panels for TAUrUs DUAL and TAUrUs DUAL Hr 500÷1300 (fig. 10)
a) Wrap the glass wool around the boiler body, ensuring that the bulb-carrying holders located on the right-hand side remain visible.
b) Lead the burner/control panel connection cables through the holes present on the lower part of panels (1S) and (1D) according to
the opening direction of the door.
c) Mount the lower panel (1S) by hooking the fold onto the square pipe and following the same procedure with the upper panel (2S).
d) Mount the upper panel (3S) onto the boiler. Position the control panel onto 3S panel; unravel the wires of the thermometer and
thermostats and insert the bulbs into the holders (P).
e) Mount panels (1D), (2D) and (3D) taking care that the wires are inserted into the slot provided in panel (3D). Finally fix the control
panel.
superinsulation (on request)
f ) Mount panels (5S) and (5D) by securing them onto the side panels of the boiler with the brackets provided. Mount the front panels
(4B) and (4A) by securing these to panels (5S) and (5D). Close the door casing with the upper panel (6), securing it with the screws
and closing the holes with the plugs provided.
g) Mount panels (8S) and (8D) by securing them to the side panels of the boiler with the brackets provided. Mount the back panels
(9B) and (9A) by securing these to panels (8S) and (8D). Close the casing of the flue chamber with the upper panel (10), securing it
with the screws and closing the holes with the plugs provided.
fig. 10
Legend
P
Bulb holders
TR1-TR2
Boiler regulating thermostats
TS
Safety thermostat
20
TM
Pump consent thermostat
TMC
Boiler thermometer

Advertisement

Table of Contents
loading

Table of Contents