InsTrUCTIOns FOr THE InsTALLEr

3.1.

Installation regulations

The boiler is designed in compliance with rules and regulations enforced in the country indicated on the technical data plate. The
installation in a different country may be a source of danger for people, animals and property.
3.2.

Installation

Use only original accessories and spare parts supplied by the manufacturer for installation as well as maintenance and any
component replacements.
Proper functioning of the boiler cannot be guaranteed in the event that non-original accessories and spare parts are used.
3.2.1.

Packaging

The boilers are supplied with the door and smoke chamber already assembled, but the boiler housing or staves with the insulation
are supplied in separate cardboard packaging.
The models with heat output between 70 kW and 400 kW are supplied with staves under boiler body, while coating load-bearing
structure and insulation are placed at the boiler side.
The models with heat output between 500 kW and 1300 kW are supplied with staves and insulation inside boiler furnace, while
frame is placed on top of the boiler.
The models with heat output above 1300 kW are supplied with pre-installed embossed aluminium shell protective insulation.
The flue brush for cleaning the tubes is delivered inside the combustion chamber.
After having removed the packaging of the boiler and accessories, ensure that these are in perfect condition.
The packaging materials are recyclable. Gather them in the appropriate collection points.
Do not leave packaging within the reach of children since it can be, by its very nature, dangerous.
The manufacturer declines any responsibility for damage to people, animals and property due to failure to observe the above.
Before commencing installation, check that the length and width of the body of the boiler delivered correspond to the dimensions
of the boiler ordered, as shown on the technical data tables, and that the cardboard boxes containing the casing are marked with
the same model.
Before connecting the boiler, perform the following operations:
• Thoroughly wash all tubing of the system in order to remove any residues which may compromise the functioning of the boiler.
• Check that the chimney has sufficient suction, that it does not have any bottlenecks and is free of slag; that it is free of discharges
from other devices (unless this duct has been specially designed to support other systems).
Ensure that all the current regulations relative to chimneys are observed.
3.2.2.

Choosing where to install the boiler

In determining the location for installing the boiler, take into consideration the instructions provided in Point 3.2.4 "Air intake/flue
gas system" and sub-paragraphs.
Installation must observe the regulations and laws in force.
It is advisable to install the boiler in a well-ventilated place and where ordinary and extraordinary maintenance can be easily