Assembly; Boiler Housing Panels For Taurus Dual And Taurus Dual Hr 70÷400 - Nova Florida Taurus Dual 70 Installation, Use And Maintenance Manual

Pressurised steel boiler
Table of Contents

Advertisement

4.

AssEMBLy

4.1.
Boiler housing panels for TAUrUs DUAL and TAUrUs DUAL Hr 70÷400 (fig. 9)
a) Wrap the glass wool around the boiler body, ensuring that the bulb-carrying holders (P) located on the right-hand side remain
visible.
b) Lead the burner-control panel connection cables through the holes present on the lower part of panels (1S) and (1D) according to
the opening direction of the door.
c) Mount panel (1S) by hooking the upper fold onto the square pipe and the lower fold to the boiler side member.
d) Mount the upper panel (2S) on the boiler and position on it the control panel. Unravel the wires of the thermostats and
thermometer and insert the bulbs in the holders.
e) Mount panel (1D) as described in point (b) and then panel (2D), checking that the wires are inserted in the slot provided. Finally fix
the control panel.
f ) Fix the upper panels with the screws and close the guide holes with the plugs provided (see figure).
superinsulation (on request)
g) Mount panels (3) and (4) by fixing them to the side panels.
Legend
P
Bulb holders
TR1-TR2
Boiler regulating thermostats
TS
Safety thermostat
TR1
TR2
TM
4
TS
P
1S
2D
2S
TMC
1D
TM
Pump consent thermostat
TMC
Boiler thermometer
3
fig. 9
19

Advertisement

Table of Contents
loading

Table of Contents