Testing Continuity - Fluke 312 User Manual

Clamp meter
Table of Contents

Advertisement

Testing Continuity

To avoid electrical shock when testing continuity in a circuit,
make sure the power to the circuit is turned off and all
capacitors are discharged.
1.
Turn the rotary function switch to
circuit being tested.
2.
Connect the black test lead to the COM terminal and the red
test lead to the Ve terminal.
3.
Connect the probes across the circuit or component to be
tested.
If the resistance is under 50 Ω, the beeper will sound continuously,
designating a short circuit. If the Meter reads OL, the circuit is
open.
PEAK
PEAK
HOLD
HOLD
1000 A
400 A
40 A
V
OFF
OFF
REL
AC/DC
MIN MAX
TRUE RMS
318
CLAMP METER
Short Circuit
Figure 7. Measuring Continuity (318 shown)
XWarning
D
40 A
OFF
OFF
Users Manual
. Remove power from the
PEAK
PEAK
HOLD
HOLD
1000 A
400 A
V
REL
AC/DC
MIN MAX
TRUE RMS
318
CLAMP METER
Open Circuit
aca17f.eps
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

318316

Table of Contents