Control Specification
3.3

Controls at Mode Changing / Start-up

3.3.1 Preheating Control
Outline
The inverter operation in open phase starts with the conditions of the outdoor temperature, the
discharge pipe temperature, the radiation fin temperature, and the preheating command from
the indoor unit.
Outdoor temperature ≥ A°C → Control I
Detail
Outdoor temperature < A°C → Control II
Control I
Control II
RXS20/25K2V1B
RXS20/25K3V1B
RXS20/25L2V1B
RXS20/25L3V1B
ARXS25L2V1B
ARXS25L3V1B
3.3.2 Four Way Valve Switching
Outline
The four way valve coil is energized / not energized depending on the operation mode.
(Heating: ON, Cooling / Dry / Defrost: OFF) In order to eliminate the switching sound as the four
way valve coil switches from ON to OFF when the heating is stopped, the OFF delay switch of
the four way valve is carried out.
Detail
OFF delay switch of four way valve
The four way valve coil is energized for 160 seconds after the operation is stopped.
40
ON condition
Discharge pipe temperature < B°C
Radiation fin temperature < 85°C
OFF condition
Discharge pipe temperature > C°C
Radiation fin temperature ≥ 90°C
ON condition
Discharge pipe temperature < D°C
Radiation fin temperature < 85°C
OFF condition
Discharge pipe temperature > E°C
Radiation fin temperature ≥ 90°C
A (°C)
–2.5
–2.5
B (°C)
C (°C)
D (°C)
10
12
10
0
2
10
SiBE041134EB
E (°C)
12
12