Mitsubishi PUHZ-SW75VHAPUHZ-SW100VHAPUHZ-SW100YHAPUHZ-SW120VHAPUHZ-SW120YHAPUHZ-SW75VHA-BSPUHZ-SW100VHA-BSPUHZ-SW100YHA-BSPUHZ-SW12 Service Manual page 89

Split-type, air to water heat pump
Table of Contents

Advertisement

OPERATING PROCEDURE
7. Removing the 4-way valve coil (21S4), LEV coil (LEV-A,
LEV-B)
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
[Removing the 4-way valve coil]
(3) Remove 4-way valve coil fixing screw (M5 × 6).
(4) Remove the 4-way valve coil by sliding the coil toward you.
(5) Disconnect the connector 21S4 (green) on the controller
board in the electrical parts box.
(6) Loosen the clamp on the separator and unbind the lead
wires.
[Removing the LEV coil]
(3) Remove the LEV coil by sliding the coil upward.
(4) Disconnect the connectors, LEV A (white) and LEV B (red),
on the controller circuit board in the electrical parts box.
(5) Loosen the clamp on the separator and under the electrical
parts box, then unbind the lead wires.
8. Removing the 4-way valve
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3) Remove the electrical parts box. (See Photo 3)
(4) Remove 3 valve bed fixing screws (4 × 10) and 4 ball valve
and stop valve fixing screws (5 × 16) and then remove the
valve bed.
(5) Remove 4 side panel (R) fixing screws (5 × 12) in the rear
of the unit and then remove the side panel (R).
(6) Remove the 4-way valve coil. (See Photo 7)
(7) Recover refrigerant.
(8) Remove the welded part of 4-way valve.
Refer to the notes below.
9. Removing the LEV
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3) Remove the electrical parts box. (See Photo 3)
(4) Remove the valve bed. (Refer to procedure 8)
(5) Remove the side panel (R). (Refer to procedure 8)
(6) Remove the LEV.
(7) Recover refrigerant.
(8) Remove the welded part of linear expansion valve.
Refer to the notes below.
10. Removing the high pressure switch (63H)
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3) Remove the electrical parts box. (See Photo 3)
(4) Remove the valve bed. (Refer to procedure 8)
(5) Remove the side panel (R). (Refer to procedure 8)
(6) Pull out the lead wire of high pressure switch.
(7) Recover refrigerant.
(8) Remove the welded part of high pressure switch.
Refer to the notes on the right.
OCH533D
Photo 7
High pressure
sensor (63HS)
Photo 8
LEV
LEV coil
(LEV B)
Valve bed
Note 1: Recover refrigerant without spreading it in the
air.
Note 2: The welded part can be removed easily by
removing the right side panel.
Note 3: When installing following parts, make sure
to cover it with a wet cloth to prevent it from
heating as the temperature below, then braze
the pipes so that the inside of pipes are not
oxidized;
• 4-way valve (procedure 8), 120°C or more
• LEV (procedure 9), 120°C or more
• High pressure switch (procedure 10), 100°C or more
89
PHOTOS
4-way valve coil
fixing screw
4-way valve
High pressure
switch (63H)
LEV coil (LEV A)
Valve bed
fixing screws
LEV
LEV coil
(LEV B)
4-way
valve

Advertisement

Table of Contents
loading

Table of Contents